PRV-9 / NH3 (التاسعة 3) — NRW Zone Study
Active roster only · Window: Jul 2025 – Jun 2026 (12 mo, Jun preliminary) · Supply: PRV-9 SCADA · AWC NRW & Energy Efficiency Dept.
← All DMAs CNS 20-07-2026
Monthly supply vs billed — Jul 2025 – Jun 2026
⚠ Jun-26 preliminary — 891 bills vs ~997 trailing avg
Supply = PRV-9 SCADA (totalizer-validated). Billing = CNS, active roster only — 77 ended accounts excluded (~1,843 m³ in-window billing no longer counted, so NRW reads slightly higher than label-based figures). ⚠ PRV-9 sole-inlet verification pending.
Problem worklist — 262 accounts (active only)
NH3: 262 of 1,109 active (23.6%)
Includes 2 new never-billed connections (86914, 92559).
X7 large customers — 6 active accounts, 10,521 m³ (12-mo)
⚠ CNS coordinates placeholder/missing — field re-survey, geocode, verify PRV-9 feed
ContractNameRouteJun-26 m³12-mo m³Action
Zone map — DMA boundary & active roster
917 of 1,109 plotted · remainder lack CNS coordinates · X7 positions field-placed (approximate)
Data quality & verification — NH3
Data as of CNS export 20-07-2026 · Supply: PRV-9 SCADA · Prepared by NRW Section · Aqaba Water Company · Made by Ehab Basuoni